Offshore

Floatel Endurance

image

Floatel International

Keppel FELS shipyard, SINGAPORE

Client: ALMACO GROUP OY, Offshore division

Duration: June 2013 – March 2015

Manpower: 50++ workers for outfitting works in public spaces and cabin areas in Singapore. Electrical Supervisor and 1 Construction Supervisor for cabin assembly in China. + on site management team in Singapore.

Scope of Work: coaming and brackets welding works, together with auxillary door frame welding works. Full outfitting of Public Spaces and cabin areas inside living quarter. Total work on 8 different decks that includes total of 440 cabins and Bridge deck. Construction- and Electrical Supervision service; Assembly of 424 modular cabins in China.

Floatel Victory

uk-floatel-secures-bp-clair-ridge-accommodation-support-contract-300

Floatel Victory

 

Floatel International
Keppel FELS shipyard, SINGAPORE
Client: ALMACO GROUP OY, Offshore division
Duration: September 2012 – March 2014
Manpower: 99 workers for outfitting works in public spaces and for cabin areas. 1 Cabin construction supervisor + 1 electrical supervisor for modular cabins assembly. + on site management team in Singapore.

 

Scope of Work: Full outfitting of Public Spaces and cabin areas in living quarter. Total work on 8 different decks that includes total of 330 cabins and bridge deck. Construction- and Electrical Supervision service; assembly of 320 modular cabins in Singapore.

Jascon 28

Screenshot 2016-06-02 12.49.56

Sea Trucks Group

Port Harcourt, NIGERIA
Duration: January 2015 – March 2015
Manpower: 17 workers

Scope of Work: Full refurbishment of all cabins flooring and toilets interior. As well new floorings for all the service areas that are to be final coated with Epoxide.

Drillship – DRU1

West-Neptune-Drillship

Drillship – DRU1

 

Enseada
Nantong Shipyard, CHINA
Client: ALMACO GROUP OY, Offshore division
Duration: February 2015 – April 2015
Manpower: 7 workers

 

Scope of Work: Various welding works such as modification of pipe hangers, cable tray supports and Bridge deck floor framing. Installation of Pipe supports (minor part only) for +GF+ and BLÜCHER piping.

kollaazid3
rope_pikk-riba-grey2

Marine

Mega Yacht SERENITY

large_1848001

Athens, Greece

Duration:  March 2016- June 2017

Manpower: up to 20 workers + on site management team.

Scope of Work: 72 meters mega yacht major interior refit of all areas together with all the interior outfitting and wet units piping modification installation drawings.

EXPLORER / ULYSSES 2 ( U116)

36087522_2224225864261757_2839340963137060864_o

Private owned MEGA YACHT

Ulsteinvik, Norway
Duration:
August 2016 – June 2018
Manpower: 15-30 workers + on site management team.
Scope of Work: 116 meters long MEGA YACHT. Outfitting of all the Public Areas and Owner Private Areas that are most Exquisite and difficult to make. 

MV Independence of the Seas Royal Caribbean Cruise Line

independenceoftheseasmain_hr1

Grand Bahama shipyard, BAHAMAS
Duration:
March 2018 – May 2018

Manpower: 70+ workers and site management team

Scope of work: Pre-outfitting of new steel blocks on the ground including background works. Major refurbishment works during the drydock on Deck 11 & Deck 12, that included installation of new raised floor and full outfitting of area that included 44 new passenger suite cabins.

Exclusive Floating Water Homes

21731634_1521273974577607_968512100062983757_o
Marasi Business Bay, Dubai
Customer: Admares Modular Construction
Finland, EUROPE & Dubai, UNITED ARAB EMIRATES
Duration: March 2016– March 2017

Manpower: 90+ workers and site management team

 

Scope of Work: all insulation work of the 10 floating buildings. Engineering, detail design, construction and installation of piping works. Interior outfitting works.

MV Sea Spirit

11

Cruise Management International Inc

Vigo, Spain

Duration: 15 April 2017- 05 May 2017

Manpower: 30 workers + on site management team.

Scope of Work: complete turnkey of full refurbishment 59 cabins, 1 owners suite and 8 public restrooms.

Aida Perla

aidaperla-cruise-ship-2017

Mitsubishi Heavy Industries

Nagasaki, Japan

Duration: May 2015 – April 2017

Manpower: up to 300 workers + on site management team.

Scope of Work: installation of modular cabins and building on site kit cabins, construction of corridors and all the interior background outfitting (electrical, piping and insulation) works. Total areas 32 000 m2.

MS Harmony of the Seas

34475E0400000578-3594361-Harmony_of_the_Seas_is_slightly_larger_than_Allure_of_the_Seas_a-a-7_1463474726987

Royal Carribbean Cruises

STX Europe Shipyard, FRANCE

Duration: December 2014 – March 2016

Manpower: 20-40 workers + on site management team.

Scope of Work: Now world biggest Cruise Ship (Overall lenght: 362 meters, Breadth: 66 meters, Draught: 9,15 meters, Max speed: 22.5nds/knots, Gross tonnage: 227 700). Outfitting of area including 500+ passenger cabins together with alleyways full outfitting on 8 decks total.

 

Explorer / Ulysses

yaht

Private owned MEGA YACHT

Ulsteinvik, NORWAY

Duration: November 2014 – May 2015

Manpower: 15-30 workers + on site management team.

Scope of Work: 107 meters long MEGA YACHT that is Top 28th from her size once fully launced. Outfitting of all the Public Areas and Owner Private Areas that are most Exquisite and difficult to make. Delivery of yacht furniture for all areas by our partner and installation by us.

 

Stena Alegra

1837275

Interislander

Singapore

Duration: April 2015 – May 2015

Manpower: 53 workers + on site management team.

Scope of Work: Full conversion of accommodationa and public areas.

 

MV Gemini

Gemini

Fleet Pro

Shetlands Islands, UK

Duration: February 2015

Manpower: 2 workers.

Scope of Work: New Vinyl flooring for crew cabins + corridors

 

Saga Pearl / MV Minerva

OLYMPUS DIGITAL CAMERA

SAGA Cruises

 

Duration: February 2006 – March 2006

Manpower: 28 workers

Scope of Work: Turnkey refurbishment – Library, main bar, stairways and corridors, cabin bathrooms, outdoor pool.

MS Kong Harald

2500x1250_kong-harald_img_1921_chris-hall---guest-image

Hurtigruten ASA

 

NORWAY

Duration: January 2006 – December 2006

Manpower: 16-36 wokrers, depending of the scope

Scope of Work: 3 times turnkey outfitting works suc as Cabin bathroom refurbishment, public area refurbishment, Cabin furniture and window boxes – installation & renovation works.

 

MS Pricess Seaways

princessseaways

DFDS SEAWAYS

 

NORWAY & ENGLAND

Duration: 2007

Manpower: 20-30 workers

Scope of Work: Turnkey refurbishment works such as Crew and officer’s mess, exterior doors and furniture package and renovation of cabin bathrooms.

 

King Seaways

King_Seaways_(ship,_1987)_001

DFDS SEAWAYS

 

DENAMRK & ENGLAND

Duration: 2006 – 2007

Manpower: 20-30 workers

Scope of Work: Various renovation and upgrade works for different areas trough few year. Renovation of cabin bathrooms, new commodore cabins, new officers and crew mess.

 

MS Jules Verne

jules verne neven

Club Cruises

 

Genova ITALY & Alicante, SPAIN

Duration: February 2007 – July 2007

Manpower: 55 workers

Scope of Work: Refurbishment of Music lounge, Disco, Shop, Crew mess and Day-rooms, new Gym and Spa area. General “face-lifting” throughout the entire vessel.

 

MV Aleksei Surkov

Screenshot 2016-05-31 13.50.51

Viking River Cruises

 

Saint Petersburg, RUSSIA

Duration: 2007

Manpower: 26-36 workers

Scope of Work: Delivery and Installation of the furniture, installation of the galley equipment, interior installation.

 

MS Santa

Screenshot 2016-05-31 13.54.07

Latvian Government

 

Riga shipyard, LATVIA

Duration: 2007 – 2008

Manpower: 18 workers

Scope of Work: Complete turnkey interior outfitting for new-building of 60 ton bollard pull tug boats.

 

MS Stella

Screenshot 2016-05-31 13.56.11

Latvian Government

 

Riga shipyard, LATVIA

Duration: 2007 – 2008

Manpower: 18 workers

Scope of Work: Complete turnkey interior outfitting for new-building of 60 ton bollard pull tug boats.

 

MSC Fantasia

MSC-Fantasia

MSC Cruises

STX Europe Shipyard, FRANCE

Duration: October 2008 – December 2008

Manpower: 16 workers

Scope of Work: Building of Cafeteria

 

MSC Splendida

675-large-8fecb20817b3847419bb3de39a609afe

MSC Cruises

 

STX Europe Shipyard, FRANCE

Duration: February 2009 – March 2009

Manpower: 4 workers for doors installation. 18 workers for Restaurant area works.

Scope of Work: Partial construction of restaurant area. Installation of decorative tailor made doors and Geze automatic door closers.

 

MS Sergei Kirov

Screenshot 2016-05-31 14.08.56

Viking River Cruises

 

Saint Petersburg, RUSSIA

Duration: 2010

Manpower: 8 workers

Scope of Work: Galley installation works and partial refurbishment of public spaces and passenger cabins and cabin areas.

 

MS Pakhomov

Screenshot 2016-05-31 14.10.18

Viking River Cruises

 

Duration: 2010

Manpower: Galley installation works and partial refurbishment of public spaces and passenger cabins and cabin areas.

Scope of Work: 8 workers

 

MS Norwegian Epic

Epic_

Norweigian Cruise Line

 

STX Europe Shipyard, FRANCE

Duration: October 2008 – May 2010

Manpower: 20 workers + on site management team

Scope of Work: Full outfitting of cabin areas including corridors. Area total size as 455 cabins + related alleyways.

 

MS Pacific Pearl

290459_10150348863504037_1528488957_o

P&O Cruises

 

Sembawang Shipyard, SINGAPORE

Duration: December 2010

Manpower: 18 workers

Scope of Work: Refurbishment of 120 cabins and outfitting of alleyways.

 

MS Norman Leader

3373931_orig

LD Lines

 

ST Marine shipyard, SINGAPORE

Duration: July 2010 – March 2011

Manpower: 12 workers for 3 months (Deluxe & Officer cabins). 1 Supervisor during 8 months

Scope of Work: Building of Deluxe/Suite and Officer cabins. Supervison service for main contractor on site.

 

MS Clipper Odyssey

Clipper Odyssey external 4

ISP

 

MALTA

Duration: 1st areas on Apr 2011. 2nd areas during the voyage June 2011 & finished on dry-dock Aug

Manpower: 12 workers during the first refurbishment works and 14 workers during the second phase works during the dry-dock.

Scope of Work: Refurbishment of observation lounge. Complete turnkey including buffet stations and refurbishment of main dining room including buffet stations and all furniture.

 

MS Celebrity Constellation

Constellation_2012-07-21_6

Celebrity Cruises

 

Grand Bahama shipyard, BAHAMAS

Duration: March 2013 – May 2013

Manpower: 46 workers + on site management team

Scope of Work: Pre-Outfitting of new steel blocks on the ground including background works. Major refurbishment works during the drydock on Deck 11 & Deck 10, that included installation of new raised floor and full outfitting of area that included 43 new passenger Suite cabins.

 

MS Celebrity Millenium

maxresdefault

Celebrity Cruises

 

Grand Bahama shipyard, BAHAMAS

Duration: March 2012 – May 2012

Manpower: 50 workers + on site management team

Scope of Work: Pre-Outfitting of new steel blocks on the ground including background works. Major refurbishment works during the drydock on Deck 11 & Deck 10, that included installation of new raised floor and full outfitting of area that included 43 new passenger Suite cabins.

 

MS Celebrity Summit

celebrity-summit-celebrity-cruises-cruise-ship-photos-2014-07-09-at-kings-wharf-bermuda

Celebrity Cruises

Grand Bahama shipyard, BAHAMAS

Duration: December 2011 – January 2012

Manpower: 50 workers + on site management team

Scope of Work: Pre-Outfitting of new steel blocks on the ground including background works. Major refurbishment works during the drydock on Deck 11 & Deck 10, that included installation of new raised floor and full outfitting of area that included 43 new passenger Suite cabins.

 

MS Celebrity Infinity

Celebrity

Celebrity Cruises

Grand Bahama shipyard, BAHAMAS

Duration: October 2011 – December 2011

Manpower: 50 workers + on site management team

Scope of Work: Pre-Outfitting of new steel blocks on the ground including background works. Major refurbishment works during the drydock on Deck 11 & Deck 10, that included installation of new raised floor and full outfitting of area that included 43 new passenger Suite cabins.

 

MSC Divina and MSC Preziosa

MSC_Divina_a_Istanbul

MSC Cruises

STX Europe Shipyard, FRANCE

Duration: January 2011 – March 2013

Manpower: 18 workers troughout the whole period + on site management team.

Scope of Work: Full outfitting of cabin areas together with alleyways. Area as of 365 cabins per one Cruise ship

MS Europa 2

MS_Europa_2--3

Hapag-Lloyd Cruises

 

STX Europe Shipyard, FRANCE

Duration: April 2012 – November 2012

Manpower: 18 workers

Scope of Work: Loading and fixation of 485 modular cabins. + on site management team.

Megastar Aries

MegaStar_Taurus_2007-07-19

Star Cruises

Sembawang Shipyard, SINGAPORE

Duration: October 2012 – December 2012

Manpower: 12 workers

Scope of Work: Refurbishment works for passenger cabins and restaurants areas.

 

Navigator of the Seas

navigator_seas

Royal Carribbean Cruises

Grand Bahama shipyard, BAHAMAS

Duration: December 2013 – February 2014 (4 weeks drydock duration)

Manpower: 51 workers + on site management team.

Scope of Work: Major refurbishment during the dry-dock on Deck 12. Pre-Outfitting of new blocks on the ground. Full outfitting of new cabin area that included 38 cabins plus corridors. + on site management team.

 

Nova Star

MV_Nova_Star

Nova Star Cruises

ST Marine shipyard, SINGAPORE

Duration: February 2014 – April 2014

Manpower: 18 workers

Scope of Work: Refurbishment and upgrading for Deck 8 & 9 aft area. Upgrading of 42 crew cabins.

 

Sensation Fasscination Elation Ecstasy

Carnival Cruise Lines’ 855-foot-long Carnival Ecstasy cruises off Cozumel, Mexico. The 70,000-ton, 2,052-passenger liner is part of the line’s popular Fantasy-class, one of the most successful series of cruise ships ever introduced. Photo by Andy Newman/Carnival Cruise Lines.

Carnival Cruise Lines

Freeport, Bahamas

Duration: Sensation: February 2015; Fascination: March
2015; Ecstasy: June 2015; Elation: August 2015

Manpower: 8-10 workers per ship.

Scope of Work: Crew communal bathrooms levelling and tiling works for 58 units per ship.

 

kollaazid4
rope_pikk-riba-grey2

Construction

Burj Al Arab Terrace

BAA9

Burj Al Arab Luxury Terrace Beach Resort
Dubai, UNITED ARAB EMIRATES
Duration: 2015-2016
Manpower: 50+ workers and site management team

Scope of Work: all insulation work on the platform.

Engineering, detail design and construction of 24 business cabanas + 8 VIP-cabanas installation on site. All interior outfitting works on the platform.

 

Resorts World – Bimini

Bimini

Resorts World – Bimini

 

Resorts World
Bimini Island, BAHAMAS
Duration: May 2014 – February 2015
Manpower: Total of 49 workers for Public areas and Hotel rooms areas + on site management team.

 

Scope of Work: HULL works. Full interior outfitting of 23 Suites, including corridors and 1st level of Public Aarea that includes Reception hall/Lobby, Sushi bar, Buffet restaurant, Piano bar & Casino corridor together with Shoppes. Tiling works for all the modular hotel rooms wet units/toilets (213) and for all Suites floor.