Top

Author: Liina

Gettone GroupArticles posted by Liina

Follow us for the latest exciting news!    

Exclusive Floating Water Homes

[mkdf_highlight background_color="" color="mediumturquoise"]Marasi Business Bay, Dubai[/mkdf_highlight] Customer: Admares Modular Construction Finland, EUROPE & Dubai, UNITED ARAB EMIRATES Duration: March 2016- March 2017 Manpower: 90+ workers and site management team   Scope of Work: all insulation work of the 10 floating buildings. Engineering, detail design, construction and installation of piping works. Interior outfitting works. ...

Read More

MV Independence of the Seas Royal Caribbean Cruise Line

[mkdf_highlight background_color="" color="mediumturquoise"]Grand Bahama shipyard, BAHAMAS[/mkdf_highlight]Duration: March 2018 – May 2018 Manpower: 70+ workers and site management team Scope of work: Pre-outfitting of new steel blocks on the ground including background works. Major refurbishment works during the drydock on Deck 11 & Deck 12, that included installation of new raised floor and full outfitting of area that included 44 new passenger suite cabins. ...

Read More

EXPLORER / ULYSSES 2 ( U116)

[mkdf_highlight background_color="" color="blue"]Private owned MEGA YACHT[/mkdf_highlight] Ulsteinvik, NorwayDuration: August 2016 – June 2018Manpower: 15-30 workers + on site management team.Scope of Work: 116 meters long MEGA YACHT. Outfitting of all the Public Areas and Owner Private Areas that are most Exquisite and difficult to make.  ...

Read More

SMM 2018, the International Maritime Trade Fair

  We are proud to announce that Gettone Group Ltd is participating The world’s leading trade fair for the maritime industry. |4 – 7 sept 2018 | Hamburg     World’s #1 trade fair for the maritime industry With over 2,200 exhibitors and about 50,000 visitors from all over the world, SMM continues to cement its position as the most important event in the maritime industry calendar. The trade fair offers a perfect stage for gathering insights, networking, cementing business deals and contributing to debates with the thought leaders in this sector.   Come to meet us at the Estonian Pavilion: ESTONIAN PAVILION stands: B2.OG.100 / B2.OG.110   view more: https://www.smm-hamburg.com/en/ https://www.youtube.com/watch?v=lIh-LURFjzc...

Read More

Gettone Group, cooperation with our customer, Admares OY has delivered the first batch of water homes to Dubai Canal – to berth at Marasi Business Bay .

We are happy to announce that Gettone Group Ltd. is involved in this great project by doing the piping, interior and heating, ventilation and air conditioning works. Luxury water homes float in on time for Cityscape Global 2017 and received a great response. With home after home anchoring in the up-and-coming marina, two of them were open for Cityscape Global visitors and received a great response. A turnkey project for Dubai Properties, the water homes will soon be surrounded by floating restaurants, all of which exclusively manufactured by Admares in the purpose-build facilities located in Rauma, Finland before transported to Dubai and finally towed at Marasi Business Bay. Equipped with the latest technology, the state-of-the-art buildings are the UAE’s first water homes that will feature both pedestrian and boat access, are located at the heart of the marina taking shape at Marasi Business Bay and set to become the development’s main architectural trait. The finished products combine centuries of ship building heritage with cutting-edge design that will forever transform waterfront living in the emirate. Marasi Business Bay, once complete, will not only feature state-of-the-art water homes that come with pools and are surrounded by floating restaurants, it will also see the Park, the...

Read More

Mega Yacht SERENITY

Athens, Greece Duration:  March 2016- June 2017 Manpower: up to 20 workers + on site management team. Scope of Work: 72 meters mega yacht major interior refit of all areas together with all the interior outfitting and wet units piping modification installation drawings. ...

Read More

MV Sea Spirit

Cruise Management International Inc Vigo, Spain Duration: 15 April 2017- 05 May 2017 Manpower: 30 workers + on site management team. Scope of Work: complete turnkey of full refurbishment 59 cabins, 1 owners suite and 8 public restrooms. ...

Read More

MEGAYACHT – Ulysses 107m

01.03.2016 Gettone Group began this classified project in 2014, which is the first of its kind for us. Today, we are happy to announce that we have successfully completed this very challenging outfitting project and delivered this 100m long mega-yacht to our customer.     http://www.boatinternational.com/yachts/news/107m-kleven-explorer-yacht-ulysses-delivered-to-owner--27137  ...

Read More

Aida Perla

Mitsubishi Heavy Industries Nagasaki, Japan Duration: May 2015 - April 2017 Manpower: up to 300 workers + on site management team. Scope of Work: installation of modular cabins and building on site kit cabins, construction of corridors and all the interior background outfitting (electrical, piping and insulation) works. Total areas 32 000 m2. ...

Read More

Burj Al Arab Terrace

Burj Al Arab Luxury Terrace Beach Resort Dubai, UNITED ARAB EMIRATES Duration: 2015-2016 Manpower: 50+ workers and site management team Scope of Work: all insulation work on the platform. Engineering, detail design and construction of 24 business cabanas + 8 VIP-cabanas installation on site. All interior outfitting works on the platform.  ...

Read More